Enquiry Checklist
Drainage Layout
The following details need to be shown on the drainage layout in order to accurately calculate the requirements necessary to provide a fully-compliant pumping station based on building regulations and British Standards.
Drainage layout showing the following;
-
Pumping station location
-
Pumping station CL (Cover Level) & IL (Invert Level)
-
Rising main route and length
-
IL level of receiving manhole
-
Pumped flow rate (if surface water or a discharge consent by the local water authority)
-
Incoming flow rate (if known)
Drainage Layout
Please note, the following checklist does not apply to surface water pumping stations:
-
Occupancy Numbers (not required foe surface water pumping station)
-
Residential - Number of houses and number of bedrooms per hous
-
Commercial/Industrial – occupancy numbers or developable area in m2
-
Address
Moduquip Ltd
35 Boulton Road
Reading
Berkshire
UK
RG2 0NH
Contact
Tel: +44 (0) 330 390 4114
Email: hello@moduquip.com
Opening Hours
Mon - Fri
7:30 am – 16:30 pm
© Copyright 2023 Moduquip Ltd. All rights reserved. Company Registered in England & Wales No. 11211524 | VAT Number 303263446

