top of page

Do Pumping Stations Really Need to Be BBA Approved?

  • matthew82126
  • Sep 3
  • 2 min read
ree

When specifying drainage or pumping stations, one question keeps cropping up: “Does it need to be BBA approved?” The short answer: No. Let’s cut through the confusion and look at what really matters.


What BBA Actually Means


The British Board of Agrément (BBA) certifies certain construction products, giving a recognised “stamp of approval” for safety and durability. This can be useful for roofing systems, insulation, and cladding — but pumping stations are not in that category. They are engineered plant and equipment, already governed by well-established British and European standards.


The Myth of “BBA-Only”


Some suppliers suggest that pumping stations must carry a BBA certificate to be compliant, insurable, or accepted by Building Control. This is not true.

  • No Building Regulation requires it.

  • NHBC does not demand it.

  • Insurers and warranty providers accept compliance through other established routes.


BBA is simply one way of showing compliance — but not the only way, and not the most relevant way for pumping stations.


The Real Routes to Compliance


Pumping stations can (and routinely do) demonstrate compliance through:

  • BS EN standards (e.g., EN 752 for drainage, EN 12056 for pumping installations, EN ISO 9906 for pump testing)

  • CE/UKCA marking under the Machinery and Construction Products Regulations

  • Manufacturer’s design calculations, warranties, and technical files

  • Professional indemnity-backed engineering design

  • Alternative third-party testing or approvals (e.g., WRc)

All of these are accepted by Building Control and warranty providers without issue.


Why “BBA-Only” is a Problem


  1. Unnecessary cost – Certification is expensive and adds no performance benefit. Clients pay more for the same outcome.

  2. Restricted choice – Currently, only one UK supplier has BBA-approved pumping stations. Insisting on it creates a sole-supplier market and removes competitive pricing.

  3. Redundant liability cover – Engineers already carry design responsibility through PI insurance. BBA doesn’t replace this; it just duplicates reassurance.

  4. Barrier to innovation – BBA approval is slow and costly, locking projects into older models and blocking newer, smarter solutions.


The Smarter Approach: Performance Specification


Instead of writing “BBA approved” into project specifications, focus on the actual performance requirements:

  • Compliance with BS EN standards

  • Structural integrity, watertightness, and durability

  • Correct duty/standby pump sizing and installation standards

  • Manufacturer warranty and aftercare support


This ensures compliance, competitive pricing, and future-proofed designs — without tying your project to unnecessary certification.


Conclusion


BBA approval has its place in construction products, but when it comes to pumping stations, it is irrelevant. What matters is compliance with standards, proven design, and robust manufacturer support. By specifying performance rather than certificates, you get better value, more choice, and solutions that meet modern project needs.

 

 
 
 

Comments


Address

Moduquip Ltd

35 Boulton Road

Reading

Berkshire

UK

RG2 0NH

Contact

Tel:   +44 (0) 330 390 4114

Email:  hello@moduquip.com

Opening Hours

Mon - Fri

7:30 am – 16:30 pm

© Copyright 2023 Moduquip Ltd.  All rights reserved.  Company Registered in England & Wales No. 11211524 | VAT Number 303263446

bottom of page